Do You Have A Project We Can Help With?
The Mannings Bathroom Installation
- Existing bathroom suite and tiles removed back to brickwork.
- All old pipework removed and new pipework installed.
- Walls were boarded with waterproof panels.
- Walls were plastered and full bathroom was tiled from floor to ceiling.
- New bathroom suite installed.
Downstairs Cloakroom
- This area was none existent, the customers builder erected the room.
- We ran all new pipework and waste pipes.
- Installed new cloakroom suite.
Project Details
DATE
May 20th, 2019
CLIENT
The Mannings
PROJECT TYPE
Domestic