Do You Have A Project We Can Help With?

The Mannings Bathroom Installation

  • Existing bathroom suite and tiles removed back to brickwork.
  • All old pipework removed and new pipework installed.
  • Walls were boarded with waterproof panels.
  • Walls were plastered and full bathroom was tiled from floor to ceiling.
  • New bathroom suite installed.

Downstairs Cloakroom

  • This area was none existent, the customers builder erected the room.
  • We ran all new pipework and waste pipes.
  • Installed new cloakroom suite.

Project Details

DATE

May 20th, 2019

CLIENT

The Mannings

PROJECT TYPE

Domestic

Project Gallery

Contact Us Today

Contact us today for a quote or to discuss any requirements you may have.

Contact us on: 01524 942848